P2 Building the Guest Suite















The Master Bed (60m2) is the first unit to be built,
the pictures below are showing the preparation of the area
before receiving the prefab steel structural elements
to be assembled on site. 









<<< >>>

Day One

The building site is ready, 
today the prefab steel elements will be delivered
and we'll start building up 
the first of the four units:
The Master Bedroom.

8.00 h

10.00 h

11.00 h

 12.30 h

 14.00 h

 14.30 h

 15.00 h

 16.30 h

 17.00 h

17.30 h

 
17.30 h

 17.30 h

Day two

18.00 h

Day Three




Day Four





Day Five







Day Six








Day Seven




Day Eight


Day Twelve

The steel shell is built and ready for wiring and pluming.












<<< >>>